Projects Location Progress Project Type  Status 
220/110/20kV Substation in Noor al Jahad (Herat) Herat 0%
Sub Station
Ongoing
Daronta turbine Rehabilitation (Nangarhar) Nangarhar 0% Hydro Power Plant Ongoing
procurement of 20kV Distribution Line from Poshte Sorkh - Ghurband (Parwan) Parwan 0%
MV/LV Distribution
Ongoing
Distribution Network of Qaisar and Almar (Faryab) Faryab 0%
MV/LV Distribution
Ongoing
Andarab Electrifications (Kabul) Kabul 0%
MV/LV Distribution
Ongoing
Kabul 12% Construction Ongoing
Kajaki Phase II Project (Helmand) Helmand 14% Hydro Power Plant Ongoing
Khak-e- Jabar Electrification (Kabul) Kabul 42%
MV/LV Distribution
Ongoing
Ozbin Distribution Network (Kabul) Kabul 52%
MV/LV Distribution
Ongoing
Badghis 20/0.4KV Distribution Network Project for 21 Villages Along the 110KV Transmission Line (Badghis) Badghis 60% MV/LV Distribution Ongoing
Curriculum development for DABS training Center Kabul 70% Consultancy Ongoing
Procurment of Design, Supply, Erection, Testing and Commissioning of Extension 110/20kV Substation in Kabul 105MW Substation (Tarakhail) (Kabul) Kabul 90%
Sub Station
Ongoing
Badpakh Distribution Network (Laghman) Laghman 96%
MV/LV Distribution
Ongoing
700kW Sokhtak MHPP (Daikundi) Daikundi 96% Hydro Power Plant Ongoing
Panjshir 20/0.4kV Electrification (Panjsher) Panjsher 96%
MV/LV Distribution
Ongoing
PPA Between DABS and Zularistan Ltd for 15 MWp of Solar Power Generation Facility Located at Kandahar, Afghanistan (Kandahar) Kandahar 100% Solar Power Plant Ongoing
Paron 700KW MHP (Noristan) Noristan 100% Construction Ongoing
Design,Supply,installation,testing and commissioning of 220kv T/L (Wardak) Wardak 100%
HV Transmission
Ongoing